Server room without ventilation and backup power
We design cooling and UPS
racks · UPS · redundancy
Project, racks, UPS, network, redundancy. The server room is the place where all the systems of the object converge, therefore we treat it accordingly.
We will respond during the day, from 9:00 to 23:00 Moscow time. If you don't need a technical specification, we'll help you draw it up.

We design cooling and UPS
Adding power backup
We examine and draw up a server diagram
Departure or planning work
Layout of racks, power and cooling
Equipment and backup power
Duplication of channels in case of failure
Installation, connection and operation verification
Diagrams and documents on the fact of installation
Contract for further support of the server
Серверы и СХДServers and data storage systems
Yes. It is best to connect at the construction stage, but we also work with existing facilities.
Yes, the executive documentation is included in the work along with the project, installation and commissioning.
Yes. We take on the maintenance of networks, servers, 1C, integrations and low-voltage systems built by us or others.
In your own words and without a technical task. We will respond during the day, from 9:00 to 23:00 Moscow time.
Is it more convenient in the messenger?
+79262103289Employees respond from 9:00 to 23:00 Moscow time, every day