It is necessary to purchase equipment for a ready-made project
We deliver according to your specification
servers · network · turnstiles
We deliver separately and as part of the project. We select it for the task, not for the warehouse, and we can design, assemble and configure it ourselves.
We will respond during the day, from 9:00 to 23:00 Moscow time. If you don't need a technical specification, we'll help you draw it up.

We deliver according to your specification
We design, assemble and configure ourselves
We select the equipment for the project
Servers and data storage systems
Switches, routers and access points
Readers, controllers, turnstiles and wristbands
Cameras, archive and remote access
Acoustics, music by zones and video walls
Online sales registers, acquiring and accepting SBP
Серверы и СХДServers and data storage systems
We look at which project the equipment is needed for and what restrictions there are: budget, deadlines, compatibility.
Equipment specification
We select the equipment for the task, and not for what is in stock.
Commercial offer
We deliver the equipment on time, if necessary with installation and configuration.
Installed and configured equipment
We take the supplied equipment for maintenance under the contract.
Support Agreement

The company started with the automation of fitness clubs: they designed the network, sound and video in the halls, installed turnstiles and connected them with 1C and a2club. We connect at the construction stage or to a working club.

Turnstiles, lockers, time rates, payment at the bar, various legal entities and wet zones. We have started such objects from scratch and we know where they break.

Industrial networks, access control systems and time tracking, video surveillance, 1C and integration with workshop equipment. Plus protection, calculated in money.

A typical branch project, a common network, a single 1C database and one support for all points.
Yes, we deliver separately and as part of the project. If necessary, we will design, assemble and configure it ourselves.
Yes, we select it for the project, not for the warehouse.

The result of the series: a summary table of all tracking technologies, a selection tree, nine typical scenarios with recommended stacks, a cost of ownership structure (where cable is more expensive than equipment), a restriction bypass matrix, a pilot plan for 4-8 weeks, a checklist of technical specifications and a forecast for 2026-2028.

When the movement data becomes personal, which requires 152-FZ from an object with visitors, where cameras cannot be placed categorically, why "counting unique visitors" by persons is biometrics with a special regime, and what responsibility is in effect after the changes of 2025. Plus the radio frequency part: what can be set without permissions, and what can not be bought in the US version.

Tracking by itself does not bring money — it brings decisions that are made on it. We analyze the session data model, metrics that really change the manager's behavior, why a heat map without normalization is useless, how to measure the implementation effect without fictitious numbers, and where integrations with 1C, cash register and locks break down.
In your own words and without a technical task. We will respond during the day, from 9:00 to 23:00 Moscow time.
Is it more convenient in the messenger?
+79262103289Employees respond from 9:00 to 23:00 Moscow time, every day