Construction is underway, but there is no network project
We design and assemble the network before finishing
Structured Cabling · LAN · Wi-Fi
We design and install the cable system and the local network of the facility: for ticket offices, turnstiles, cameras, employees and guest Wi-Fi.
We will respond during the day, from 9:00 to 23:00 Moscow time. If you don't need a technical specification, we'll help you draw it up.

We design and assemble the network before finishing
Recalculating the network under load
We examine and put the tracks in order
Departure or planning work
Cable network diagram for the object
Laying the cable to the workplaces
Separate networks for staff and guests
Setting up and checking the network operation
Diagrams and documents on the fact of installation
Contract for further support of the network
СКСStructured cabling system of the facility
Before finishing. Cable routes for cameras and sound are laid before it, otherwise the work costs noticeably more and longer.
Yes. It is best to connect at the construction stage, but we also work with existing facilities.
Yes, the executive documentation is included in the work along with the project, installation and commissioning.
In your own words and without a technical task. We will respond during the day, from 9:00 to 23:00 Moscow time.
Is it more convenient in the messenger?
+79262103289Employees respond from 9:00 to 23:00 Moscow time, every day